September 2010
49 posts
Git mirror for pkgsrc being rebuild →
Our mirror of the never-quite-official git repository for pkgsrc is being rebuilt, so it will be temporarily inaccessible. Matthew Dillon is working on building a new one directly from pkgsrc…
Sep 30th
BSDTalk 198: MeetBSD Cali 2010 →
BSDTalk 198 has 12 minutes of conversation with Matt Olander and James T. Nixon, about MeetBSD. (which is November 5th and 6th.)
Sep 30th
BSD Show! – Olander, Schwartz →
The BSD Show! has a 15 minute talk with Matt Olander about MeetBSD, and a 14-minute B-Side with Randal Schwartz, who writes books and does podcasts. (there, even more to listen to now.)
Sep 30th
x86_64 bootable help, revisited →
It looks like my prior article was incorrect: it was a different issue than MADT causing problems with booting x86_64. Scrambled memory report appears to be at the heart of the issue; in any case,…
Sep 30th
Flash 9 on DragonFly →
Chris Turner wrote up his experience of getting Flash 9 to work on DragonFly. The usual disclaimers apply.
Sep 30th
OpenSSL notes →
Peter Avalos wrote a note that better summarized my earlier post, and mentioned a problem/workaround with ssh and non-md5 MACs.
Sep 29th
x86_64 bootable help, sorta →
John Marino found that when he couldn’t boot a x86_64 development image in Virtualbox, setting the sysctl hw.madt_probe_test=1 seemed to make a difference long enough to boot, though it still…
Sep 29th
Welcome back, you two →
Two committers who went dormant some time ago: Nuno Antunes and Robert Garrett. Two committers who recently became active again? Nuno Antunes and Robert Garrett. Welcome, back, guys. Developers…
Sep 28th
Don’t upgrade, do recompile →
A bump in shared library version for libssl/libcrypto means that any programs dependent on it will require a rebuild – including any pkgsrc programs. This only affects you if you are running 2.7,…
Sep 28th
Revised pkgsrc guide →
I’ve drastically revamped the pkgsrc howto on the dragonflybsd.org website. It’s also linked in that site’s menu, too. Comments please!
Sep 28th
Lazy Reading: subversion, packaging, beams →
A small crop for Lazy Reading this week – oh well. Bad things about SVN. I’ve always thought git is more interesting, but subversion is easier. Oh well. The article is also fun for the…
Sep 27th
Binary package upgrade issue →
I’ve noticed that if you have older pkgsrc packages installed, and install binary packages for pkgsrc-2010Q2, those packages will refuse to install if pkg_install is an older version than what they…
Sep 27th
Squid issues →
Jan Lentfer updated his version of squid, and had issues; this is a note for anyone else running squid to maybe wait before upgrading. Note that this applies to the development version of squid,…
Sep 26th
Crater disk craters →
A hard disk in crater.dragonflybsd.org, where the repo for DragonFly source is located, died last night. The disk has been replaced, and the files should all be back in place later today….
Sep 26th
Project lists galore →
If you were looking for something to do, Samuel J. Greear has invested some time in cleaning up the various project idea pages out there, and has links to prove it.
Sep 25th
The return of Fred →
Did you know Fred is the name for the DragonFly mascot? Well, you do now. He’s also back in the bootloader, thanks to Joe Talbott.
Sep 25th
pkgsrc database, compiler changes →
I mentioned previously that Postgres 9 is already in pkgsrc, but the flip side of that is both Postgres 8.2, and MySQL 4 are being removed. If you still have these installed, be ready to migrate…
Sep 24th
2.8 release in a few weeks →
It looks like 2.8 will be showing up in a few weeks – mid-October. If things go well, we’ll have prebuilt pkgsrc-2010Q3 binaries to go with it.
Sep 24th
Idlezero, explained →
Venkatesh Srinivas (whee!) has written up a lengthy post about his idlezero work. It provides a nice peek into recent work, and how parts of DragonFly work. I’d normally save it for a Lazy…
Sep 23rd
Freeze for pkgsrc-2010Q3 starting soon →
Starting September 23rd, pkgsrc will freeze (i.e. bugfixes only) in preparation for the 2010Q3 release, which is planned for one week later, instead of the usual 2 weeks. This release will include…
Sep 22nd